Hydro Electric

John Hart Dam Spillway Refurbishment

image 9

Project type: Hydro Electric
Location: Campbell River BC
General contractor: Brymark Installations
Electrical budget: $ 1.8 million
Project contact: Bill Adamson
Date completed: October, 2007


The complete rewire of all electric systems on the spillway. The scope of this work included a new generator building c/w a 125kw backup generator and a new control building c/w MCC, PLC and backup power supply. New electric motors were installed for the drives and complete rigid conduit network was installed to accomodate the 5 redunant power systems.

This project was a design build project which involved some unique limit switch situations. The creativity of the Vicar Electric personnel and their fabrication abilities resulted in a solution that was top notch.