Cranes

image 1GM Shrum Stoplog Crane

Project type: Cranes
Location: WAC Bennett Dam, Hudson Hope BC
General contractor: T Mar Industries
Electrical budget: $ 600,000
Project contact: George Lambert
Date completed: March, 2008

 

This project was the complete rebuild of the GM Shrum Stoplog crane. All systems were disconnected on site and the crane dismantled by Brymark Installations. It was then shipped to T mar Industries in Campbell River where it was stripped down and rebuilt from top to bottom. Each piece of the crane was rewired on the spot and then each section was wired together and tested in the shop to ensure top performance once assembled on site.

A new control room/ generator room was fabricated and wired and a new operator cab was wired and installed. Shore power was installed to facilitate good operating order for the systems on this self powered crane. The cold climate conditions and extreme operating parameters were a challenge on this project and the Vicar crew handled it well.

1232560584
1232650751
1232650916
1232650986
1232651100
1232651141
1232651189
1233081312
1233081506
1233081599
1233081712
1233081766
1233081867
01/13 
start stop bwd fwd